Well I don't know if I
should be elated, I'll explain, our just excited. But over the precious two days I've begun lashing bulkheads and hull sides together making a roughed out 3D Paradox for the first time. It looks fabulous, though I've noticed as few errors with the bevel, but they're easily repaired.
No the biggest job is to repair a faulty scarphi join. After I lashed the Transom in position and left for Merewether, the starboard join opened up! I can't say whether it was under extraordinary load, the shorter Australian (metric) plywood sheets meant the join is wider of the bulkhead, or my epoxy is out of date. Either way, I'll have to clean it out and repair it with a new purchase of epoxy. I'll get it done, "spilt milk" and all.
No comments:
Post a Comment